|
I) Book Chapters:
1)
Javadian, N., Gol Alikhani, M. and Tavakkoli-Moghaddam, R., A
discrete binary version of the electromagnetism-like heuristic for solving
traveling salesman problem, In: D.-S. Huang et al. (Eds.), ICIC 2008,
Lecture Notes in Artificial Intelligence (LNAI),
Vol. 5227, Springer-Verlag, 2008, pp. 123-130.
2)
Tavakkoli-Moghaddam, R.,
Ghezavati, V.R., Kaboli, A. and Rabbani, M., An efficient hybrid method for an
expected maximal covering location problem, in: Nguyen, N.T. and Katarzyniak, R.
(Eds.), New Challenges in Applied Intelligence Technologies of Studies
in Computational Intelligence, Vol. 134, Springer-Verlag, 2008, pp. 289-298.
3)
Panahi, H., Rabbani, M. and Tavakkoli-Moghaddam, R., A comparison of
three meta-heuristics for a closed-loop layout problem with unequal-sized
facilities, in: Nguyen, N.T. and Katarzyniak, R. (Eds.), New Challenges in
Applied Intelligence Technologies of Studies in Computational
Intelligence, Vol. 134, Springer-Verlag, 2008, pp. 265-278.
4)
Tavakkoli-Moghaddam, R.,
Rahimi-Vahed, A. and Hossein-Mirzaei, A., Solving a multi-objective no-wait flow
shop problem by a hybrid multi-objective immune algorithm, in: Levner, E. (Ed.),
Multiprocessor Scheduling: Theory and Applications,
I-Tech Education and Publishing, Vienna: Austria, ISBN 978-3-902613-02-8, 2007,
pp. 195-214.
5)
Tavakkoli-Moghaddam, R.
and Safaei, N., A new mathematical model for flexible flow lines with blocking
processor and sequence-dependent setup time, in: Levner, E. (Ed.),
Multiprocessor Scheduling: Theory and
Applications, I-Tech Education and
Publishing, Vienna: Austria, ISBN 978-3-902613-02-8, 2007, pp. 256-272.
6)
Mirghorbani, S.M, Rabbani, M., Tavakkoli-Moghaddam, R. and
Rahimi-Vahed, A., A multi-objective particle swarm for a mixed-model assembly
line sequencing, Book Chapter in:
Operations Research Proceedings 2006,
Part VI, pp. 181-186, DOI: 10.1007/978-3-540-69995-8_30.
7)
Rabbani, M., Rahimi-Vahed, A., Javadi, B. and Tavakkoli-Moghaddam, R.,
A new approach for mixed-model assembly line sequencing, Book Chapter in:
Operations Research Proceedings 2006,
Part VI, pp. 169-174, DOI: 10.1007/978-3-540-69995-8_28.
8)
Rahimi-Vahed, A., Rabbani, M., Tavakkoli-Moghaddam, R., Jolai, F.
and Manavizadeh, N., Mixed-model assembly line sequencing using real options,
Book Chapter in: Operations Research
Proceedings 2006, Part VI, pp.
161-167, DOI: 10.1007/978-3-540-69995-8_27.
9)
Tavakkoli-Moghaddam, R.,
Safaei, N. and Babakhani, M., Solving a dynamic cell formation problem
with machine cost and alternative process
plan by memetic algorithms, In: O. B. Lupanov, O.M. Kasim-Zade, A.V. Chaskin and
K. Steinhofel (eds.),
Stochastic algorithms: Foundation and Applications, Lecture Notes in Computer
Science, Vol. 3777,
Springer-Verlag, Berlin, 2005, 213-227, (IDS Number: BDQ12).
II) Journal Papers:
1)
Tavakkoli-Moghaddam, R.,
Safaei, N. and Sassani, F., A memetic algorithm for the flexible flow line
scheduling problem with processor blocking, Computers and Operations Research,
Vol. 36, No. 2, pp. 402-414, 2009.
2)
Tavakkoli-Moghaddam, R.,
Ranjbar-Bourani, M., Mirzahosseinian, H. and Aryanezhad M.B., A new
multi-objective model for a cell formation problem considering machine
utilization and alternative process routes,
Int. J. of Engineering,
Transaction A: Basic,
Vol. 22, No. 1, pp. 21-32, 2009.
3)
Tavakkoli-Moghaddam, R.,
Sayarshad, H.R. and T.Y. ElMekkawy, T.Y., Solving a new
multi-period mathematical model of the rail-car fleet size and car utilization
by simulated annealing, Int. J. of
Engineering,
Transaction A: Basic,
Vol. 22, No. 1, pp. 33-46, 2009.
4)
Tavakkoli-Moghaddam, R.,
Aryanezhad, M.B., Kazemipoor, H. and Salehipour, A., Partitioning machines in
tandem AGV systems based on “balanced flow strategy” by simulated annealing,
Int. J. of Advanced Manufacturing Technology, Vol. 38, Nos. 3-4, pp.
355-366, 2008.
5)
Seifi, M. and Tavakkoli-Moghaddam, R., A new bi-objective model
for a multi-mode resource-constrained project scheduling problem with discounted
cash flows and four payment models,
Int. J. of Engineering,
Transaction A: Basic,
Vol. 21, No. 4, pp. 347-360, 2008.
6)
Tavakkoli-Moghaddam, R.,
Taheri, F. and Bazzazi, M., Multi-objective unrelated parallel machines
scheduling with sequence-dependent setup times and precedence constraints,
Int. J. of Engineering,
Transaction A: Basic,
Vol. 21, No. 3, pp. 269-278, 2008.
7)
Tavakkoli-Moghaddam, R.,
Aryanezhad, M.B., Kazemipoor, H. and Salehipour, A., A threshold accepting
algorithm for partitioning machines in a tandem automated guided vehicle,
IUST - Int. J. of Engineering Science, Vol. 19, No. 1-2, pp. 33-42, 2008.
8)
Rabbani, M.,
Tavakkoli-Mogahddam, R. and Parsa, H., A mathematical model for a
distribution network problem in a multi-product supply chain system: A real case
study, Int. J. of Manufacturing and Technology Management, Vol. 15, No.
1, pp. 1-11, 2008.
9)
Rahimi-Vahed, A.R., Javadi, B., Rabbani, M. and Tavakkoli-Moghaddam,
R., A multi-objective scatter search for a bi-criteria no-wait flow shop
scheduling problem, J. of Engineering Optimization,
Vol. 40, No. 4, pp. 331-346, 2008.
10)
Tavakkoli-Mogahddam,
R., Safaei, N. and Kah, M.M.O.,
Accessing feasible space in a generalized job shop scheduling problem with the
fuzzy processing times: A fuzzy-neural approach, J. of the Operational
Research Society, Vol. 59, pp. 431-442, 2008.
11)
Tavakkoli-Moghaddam, R.,
Safaei, N. and Sassani, F., A new solution for a dynamic cell formation problem
with alternative routing and machine costs using simulated annealing, Journal
of the Operational Research Society, Vol. 59, pp. 443-454, 2008.
12)
Tavakkoli-Moghaddam, R.,
Rahimi-Vahed, A.R. and Mirzaei, A.H., Solving a multi-objective no-wait flow
shop scheduling problem by an immune algorithm, Int. J. of Advanced
Manufacturing Technology, Vol. 36, Nos. 9-10, pp. 969-981, 2008.
13)
Zaerpour, N., Rabbani, M., Gharehgozli, A.H. and Tavakkoli-Moghaddam,
R., Make-to-order or make-to-stock decision by a novel hybrid approach,
Advanced Engineering Informatics, Vol. 22, Issue 2, 2008, pp. 186-201.
14)
Tavakkoli-Moghaddam, R.,
Gholipour-Kanani, Y. and Cheraghalizadeh, R. A genetic and memetic algorithm
approach to sequencing and scheduling of cellular manufacturing systems, Int.
J. of Management Science and Engineering Management, Vol. 3, No. 2, pp.
119-130, 2008.
15)
Ebadian, M., Rabbani, M., Jolai, F., Torabi, S.A. and
Tavakkoli-Moghaddam, R., A new decision-making structure for the order entry
stage in make-to-order environments, Int. J. of Production Economics,
Vol. 111, pp. 351-367, 2008.
16)
Tavakkoli-Moghaddam, R.,
Minaeian, S. and Rabbani, M., A new multi-objective model for dynamic cell
formation problem with fuzzy parameters,
Int. J. of Engineering,
Transaction A: Basic,
Vol. 21, No. 2, pp. 159-172, 2008.
17)
Tavakkoli-Moghaddam, R.,
Safari J. and Sassani, F., Reliability optimization of series-parallel systems
with a choice of redundancy strategies using a genetic algorithm, Reliability
Engineering and System Safety, Vol. 93, No. 4, pp. 550-556, 2008.
18)
Safaei, N., Saidi-Mehrabad, M., Tavakkoli-Moghaddam, R. and
Sassani, F., A fuzzy programming approach to a cell formation problem with
dynamic and uncertain conditions, Fuzzy Sets and Systems,
Vol. 159, No. 2, pp. 215-236, 2008.
19)
Razmi, J., Tavakkoli-Moghaddam, R., Zairi, M. and Mousavi, N.,
Application of TOPSIS, AHP and GIS in a multi-attribute model to solve location
problem for bank branches - An empirical study in Iran, Int. J. of Excellence
in Public Sector Management, Vol. 1, No. 2, pp. 21-34, 2007.
20)
Tavakkoli-Moghaddam, R.,
Aryanezhad, M.B., Safaei, N., Vasei, M., Azaron, A.,
A new approach for the cellular manufacturing
problem in fuzzy dynamic conditions by a genetic algorithm,
J. of Intelligent & Fuzzy Systems,
Vol. 18, No. 4, pp. 363-376, 2007.
21)
Tavakkoli-Moghaddam, R.,
Rahimi-Vahed, A. and Hossein-Mirzaei, A., A hybrid multi-objective immune
algorithm for a flow shop scheduling problem with bi-objectives: Weighted mean
completion time and weighted mean tardiness, Information Sciences, Vol.
177, No. 22, pp. 5072-5090, 2007.
22)
Kaboli, A. Aryanezhad, M.B.,
Shahanaghi, K. and Tavakkoli-Moghaddam, R., A holistic approach based on
MCDM for solving location problems,
Int. J. of Engineering,
Transaction A: Basic,
Vol. 20, No. 3, pp. 251-262, 2007.
23)
Tavakkoli-Moghaddam, R.
and Mehdizadeh, E., A new ILP model for identical parallel-machine scheduling
with family setup times minimizing the total weighted flow time by a genetic
algorithm, Int. J. of Engineering,
Transaction A: Basic, Vol. 20, No. 2, pp. 183-194, 2007.
24)
Tavakkoli-Moghaddam, R.
and Safari, J., A new mathematical model for
a redundancy allocation problem with mixing components redundant and choice of
redundancy strategies, Applied Mathematical Sciences,
Vol. 1, No. 45, pp. 2221-2230, 2007.
25)
Tavakkoli-Moghaddam, R.,
Safaei, N., Kah, M.M.O. and Rabbani, M., A new capacitated vehicle routing
problem with split service for minimizing fleet cost by simulated annealing,
J. of the Franklin Institute, Vol. 344, No. 5, pp. 406-425, 2007.
26)
Azaron, A., Sakawa, M., Tavakkoli-Moghaddam, R. and Safaei, N., A
discrete-time approximation technique for the time-cost trade-off in PERT
networks, RAIRO - Operations Research, Vol. 41, No. 1, pp. 61-81, 2007.
27)
Azaron, A., Tavakkoli-Moghaddam, R., Multi-objective time-cost
trade-off in dynamic PERT networks using an interactive approach, Eur. J. of
Operational Research, Vol. 180, No. 3, pp. 1186-1200, 2007.
28)
Rahimi-Vahed, A.R., Rabbani, M., Tavakkoli-Moghaddam, R., Torabi,
S.A. and Jolai, F., A multi-objective scatter search for a mixed-model assembly
line sequencing problem, Advanced Engineering Informatics, Vol. 21, Issue
1, pp. 85-99, 2007.
29)
Tavakkoli-Moghaddam, R.,
Javadian, N., Javadi, B. and Safaei, N., Design of a facility layout problem in
cellular manufacturing systems with stochastic demands, Applied Mathematics
and Computation, Vol. 184, Issue 2, pp. 721-728, 2007.
30)
Tavakkoli-Moghaddam, R.,
Jolai, F., Khodadadeghan, Y. and Haghnevis, M., A mathematical model of a
multi-criteria parallel machine scheduling problem: a genetic algorithm,
Int. J. of Engineering,
Transactions A: Basic, Vol. 19, No.
1, pp. 79-86, 2006.
31)
Tavakkoli-Moghaddam, R.,
Javadi, B., Jolai, F. and Mirghorbani, S.M., An efficient algorithm to inter and
intra-cell layout problems in cellular manufacturing systems with stochastic
demands, Int. J. of Engineering,
Transactions A: Basic, Vol. 19, No.
1, pp. 67-78, 2006.
32)
Rabbani,
M., Tavakkoli-Moghaddam, R., Jolai, F. and
Ghorbani, H.R., A comprehensive
model for R&D project portfolio
selection with zero-one linear goal-programming,
Int. J. of Engineering,
Transactions A: Basic, Vol. 19, No.
1, pp. 55-66, 2006.
33)
Tavakkoli-Moghaddam, R.
and Rahimi-Vahed, A.R., Multi-criteria sequencing problem for a mixed-model
assembly line in a JIT production system, Applied Mathematics and Computation,
Vol. 181, Issue 2, 2006, pp. 1471-1481.
34)
Tavakkoli-Moghaddam, R.,
Saremi, A.R. and Ziaee, M.S., A memetic algorithm for a vehicle routing problem
with backhauls, Applied Mathematics and
Computation, Vol. 181, Issue 2, pp. 1049-1060, 2006.
35)
Azaron, A. and Tavakkoli-Moghaddam, R., A multi-objective resource
allocation problem in dynamic PERT networks, Applied Mathematics and
Computation, Vol. 181, Issue 1, pp. 163-174, 2006.
36)
Jolai, F., Tavakkoli-Moghaddam, R., Rabbani, M. and Sadoughian,
M.R., An economic production lot size model with deteriorating items,
stock-dependent demand, inflation, and partial backlogging, Applied
Mathematics and Computation, Vol. 181, Issue 1, pp. 380-389, 2006.
37)
Tavakkoli-Moghaddam, R.,
Safaei, N. and Gholipour, Y., A hybrid simulated annealing for capacitated
vehicle routing problems with the independent route length, Applied
Mathematics and Computation, Vol. 176, Issue 2, pp. 445-454, 2006.
38)
Tavakkoli-Moghaddam, R.,
Javadi, B. and Safaei, N., Solving a mixed-integer model of a single machine
scheduling problem by a fuzzy goal programming approach, WSEAS Transactions
on Business and Economics, Vol. 3, Issue 2, pp. 45-52, 2006.
39)
Tavakkoli-Moghaddam, R.,
Moslehi, G., Vasei, M. and Azaron, A., A branch-and-bound algorithm for a single
machine sequencing to minimize the sum of maximum earliness and tardiness with
idle insert, Applied Mathematics and Computation, Vol. 174, Issue 1, pp.
388-408, 2006.
40)
Tavakkoli-Moghaddam, R.
and Safaei, N., Solving a generalized aggregate
production planning problem by genetic
algorithms, J. of Industrial Engineering - Int., Vol. 2, No. 1, 53-64,
2006.
41)
Towhidi,
N., Tavakkoli-Moghaddam, R. and Vahdat, S.E., The use of fuzzy logic
theory for selecting appropriate tool steels with price analysis, Iranian J.
of Science & Technology, Transaction B: Engineering, Vol. 29, No. B6,
559-567, 2005.
42)
Tavakkoli-Moghaddam, R.,
Moslehi, G., Vasei, M. and Azaron, A.,
Optimal scheduling for a single
machine to minimize the sum of maximum earliness and tardiness considering idle
insert, Applied Mathematics and Computation, Vol. 167, Issue 2,
pp. 1430-1450, 2005.
43)
Tavakkoli-Moghaddam, R.
and Daneshamnd-Mehr, M., A computer
simulation model for job shop scheduling problems minimizing the makespan,
Computers and Industrial Engineering,
Vol. 48, No. 4, pp. 811-826, 2005.
44)
Tavakkoli-Moghaddam, R.,
Jolai, F., Vaziri, F. Ahmed, P.K. and Azaron, A., A hybrid method for solving
stochastic job shop scheduling problems, Applied Mathematics and Computation,
Vol. 170, Issue 1,
pp. 185-206,
2005.
45)
Tavakkoli-Moghaddam,
R., Aryanezhad, M.B., Safaei, N. and Azaron, A., Solving a dynamic cell
formation problem using metaheuristics, Applied Mathematics and Computation,
Vol. 170, Issue 2,
pp. 761-780, 2005.
46)
Tavakoli-Moghadam,
R., Rabbani, M., Ghodratnama, A. and Ahmed, P.K., Allocation of parts to
cells minimizing tardiness and idle time by simulated annealing, Int. J. of
Manufacturing Technology and Management, Vol. 7, Nos. 5/6, pp. 581-593,
2005.
47)
Tavakkoli-Moghaddam, R.,
Razmi, J., Ghaffari, M. and Ghodratnama, A., Assessment of benchmarking method
in a car part production industry, IUST - Int. J. of Engineering Science,
Vol. 16, No. 1, pp. 125-133, 2005.
48)
Tavakkoli-Moghaddam, R.,
Safaei, N. and Shariat M.A., A
multi-criteria vehicle routing problem with soft time windows by simulated
annealing, J. of Industrial Engineering - Int., Vol. 1, No. 1, 28-36,
2005.
49)
Tavakoli-Moghadam, R.,
Rabbani, M., Godratnama, A. and Safaei, N., An efficient algorithm to allocate
parts to cells minimizing total tardiness and idle times,
Int. J. of Engineering,
Transactions B: Applications, Vol. 17, No. 4, pp. 375-382, 2004.
50)
Tavakkoli-Moghaddam, R.,
Azaron, M.
and Mehrad-Pay, L. Optimal control of service rate in a service center
with Lapse,
Int. J. of Engineering,
Transactions B: Applications, Vol. 17, No. 3, pp. 289-298, 2004.
51)
Tavakkoli-Moghaddam, R.,
Azaron, M.
and Mehrad-Pay, L. Optimal control of service rate in a service center,
Int. J. of Applied Mathematics, Vol. 13, No. 2, pp. 137-153, 2003.
52)
Tavakkoli-Mogahddam, R.,
A continuous plane model to machine layout problems considering pick-up and
drop-off points: an evolutionary algorithm, Int. J. of Engineering, Vol.
16, No. 1, 2003, pp. 59-70.
53)
Tavakkoli-Moghaddam, R.,
Mathematical programming models for solving unequal-sized facilities layout
problems: A genetic search method, Int. J. of Engineering, Vol. 12, No.
4, pp. 233-245, 1999.
54)
Tavakkoli-Moghaddam, R.
and Shayan, E., Facilities layout design by genetic algorithms, Int. J. of
Computers and Industrial
Engineering, Vol. 35, Nos 3-4, pp.
527-530, 1998.
III) Conference Papers:
1)
Tavakkoli-Moghaddam, R.,
Siadat, A. and Kaboli, A., A decision support system for facility location
selection based on a fuzzy house of quality method, IEEE on Management, Bangkok,
Thailand, 21-24 Sep. 2008, pp. 1061-1065.
2)
Tavakkoli-Moghaddam, R.,
Khalili, M. and Naderi, B., A variable neighborhood search method for a flowshop
scheduling problem to minimize makespan, In: Sheibani, K. (ed.), Lecture
Notes in Management Science, (Presented at the 1st Int. Conf.
on Applied Operations Research (ICAOR’08), Yerevan, Armenia, 15-17 Sep.
2008), Vol. 1, pp. 62-71.
3)
Panahi, H., Rabbani, M. and Tavakkoli-Moghaddam, R., A
multi-objective particle swarm optimization for an open shop scheduling problem
minimizing the total flow time and weighted tardiness, Proc. of the Int.
Conf. on Operations Research 2008, Augsburg, Germany, 3-5 September 2008.
4)
Mehdizadeh, E. and Tavakkoli-Moghaddam, R., Vibration damping
optimization, Proc. of the Int. Conf. on Operations Research 2008,
Augsburg, Germany, 3-5 September 2008.
5)
Malekly, H., Tavakkoli-Moghaddam, R. and Panahi, H., A
mathematical model for a multi- objective dynamic multi-Commodity capacitated
facility location problem with CVaR criterion, Proc. of the Int. Conf. on
Operations Research 2008, Augsburg, Germany, 3-5 September 2008.
6)
Tavakkoli-Moghaddam, R.
and Javadi, B., Solving a bi-objective
no-wait flow shop scheduling problem by a fuzzy goal programming approach, In:
Manufacturing Fundamentals:
Necessity
and Sufficiency, Chapter 16, Modeling:
Scheduling and Project Management,
(Presented at the 3rd Int. Conf. on Production and Operations
Management, Tokyo, Japan, 3-5 August 2008), pp. 2325-2336.
7)
Tavakkoli-Moghaddam, R.,
Malekly, H. and Saati, S., Modeling a hybrid DEA method for a dynamic multi-commodity
capacitated facility location problem, In: Manufacturing Fundamentals:
Necessity
and Sufficiency, Chapter 19, Modeling:
Logistics and Physical Distribution,
(Presented at the 3rd Int. Conf. on Production and Operations
Management, Tokyo, Japan, 3-5 August 2008), pp. 2662-2674.
8)
Panahi, H., Tavakkoli-Moghaddam, R. and Torabi, S.A., Solving an
open shop scheduling problem by a multi-objective immune algorithm, In:
Manufacturing Fundamentals: Necessity
and Sufficiency, Chapter 16, Modeling:
Scheduling and Project Management,
(Presented at the 3rd Int. Conf. on Production and Operations
Management, Tokyo, Japan, 3-5 August 2008), pp. 2337-2350.
9)
Mojibi, T., Tabari, M. and Tavakkoli-Moghaddam, R., An integrated
BSC model for the performance evaluation of public organizations, In:
Manufacturing Fundamentals: Necessity
and Sufficiency, Chapter 10, Environmental
and Sustainable Management, (Presented
at the 3rd Int. Conf. on Production and Operations Management,
Tokyo, Japan, 3-5 August 2008), pp. 1704-1718.
10)
Tavakkoli-Moghaddam, R.,
Sheikh-Sajadieh, M., Mojibi, T. and Tabari, M., An inventory model for
deteriorating items under stochastic supply lead-time, In: Manufacturing
Fundamentals: Necessity
and Sufficiency, Chapter 15, Modeling:
Inventory Management, (Presented at the 3rd Int. Conf. on Production and
Operations Management, Tokyo, Japan, 3-5 August 2008), pp. 2176-2184.
11)
Panahi, H. and Tavakkoli-Moghaddam, R., Solving an open Shop
scheduling problem by a novel hybrid multi-objective ant colony optimization,
In: Xhafa, F., Herrera, F., Abraham, A., Köppen, M. and Bénitez, J.M., (Eds.),
Proc. of the
8th Int. Conf. on Hybrid Intelligent
Systems, Barcelona, Spain, September
10-12, 2008, Published by IEEE Computer Society.
12)
Mauchand, M., Kaboli, A., Siadat, A. and Tavakkoli-Moghaddam, R.,
A hybrid decision making approach for value chain analysis?, Proc. of the 20th Int. Conf. on Systems Research, Informatics and
Cybernetics, Baden-Baden, Germany,
24-30
July 2008.
13)
Salehi, M. and Tavakkoli-Moghaddam, R., Project selection by
using a fuzzy TOPSIS technique, Proc. of World Academy of Science,
Engineering and Technology (WCSET), 4-6 July 2008, Paris, France, ISSN:
1307-6884, ,Vol. 30, pp. 85-90, 2008.
14)
Tavakkoli-Moghaddam,
R. and Hassanzadeh-Amin S., A decision
support system for facility location selection based on a fuzzy house of
quality method, Proc. of the
10th Int. Conf. on Enterprise Information Systems (ICEIS),
Barcelona, Spain, June 12-16, 2008, pp.
403-406.
15)
Panahi, H. and Tavakkoli-Moghaddam,
R., An efficient hybrid method for
clustering problems, Proc. Of the
10th Int. Conf. on Enterprise Information Systems (ICEIS),
Barcelona, Spain, June 12-16, 2008, pp.
228-294.
16)
Minaeian, S. and
Tavakkoli-Moghaddam,
R., Designing a multi-objective model
for a cell formation problem under dynamic and fuzzy conditions,
Proc. of the Conference on Optimization:
Techniques and Applications (ICOTA7),
Kobe, Japan, December 12-15, 2007.
17)
Rezaei, M. and
Tavakkoli-Moghaddam,
R., A mathematical model for
scheduling flexible flow lines with limited intermediate buffers and
sequence-dependent setup times, Conference on Optimization: Techniques and
Applications (ICOTA7), Kobe, Japan, December 12-15, 2007.
18)
Tavakkoli-Moghaddam,
R. and Panahi, H., Solving a new
mathematical model of a closed-loop layout problem with unequal-sized facilities
by a genetic algorithm, Proc. of the IEEE Int. Conf. on Industrial
Engineering and Engineering Management (IEEM 2007), M. Helander, M. Xie, R.
Jiao and K.C. Tan (Eds.), Singapore, December 2-5, 2007, pp. 327-331.
19)
Tavakkoli-Moghaddam,
R., Bozorgzad, A.A. and
Gholipour-Kanani, Y., The use of a memetic algorithm in operations scheduling of
cellular manufacturing systems with makespan, Proc. of the IEEE Int. Conf. on
Industrial Engineering and Engineering Management (IEEM 2007), M. Helander,
M. Xie, R. Jiao and K.C. Tan (Eds.), Singapore, December 2-5, 2007,
pp. 1120-1124.
20)
Tavakkoli-Moghaddam, R.,
Rabbani, M., Gharehgozli, A.H. and Zaerpour, N., A fuzzy aggregate
production planning model for make-to-stock
environments, Proc. of the IEEE Int. Conf. on Industrial Engineering and
Engineering Management (IEEM 2007), M. Helander, M. Xie, R. Jiao and K.C.
Tan (Eds.), Singapore, December 2-5, 2007, pp. 1609-1613.
21)
Mehdizadeh, E. and
Tavakkoli-Moghaddam, R., A hybrid fuzzy clustering PSO algorithm for
a clustering supplier problem, Proc. of the IEEE Int. Conf. on Industrial
Engineering and Engineering Management (IEEM 2007), M. Helander, M. Xie, R.
Jiao and K.C. Tan (Eds.), Singapore, December 2-5, 2007, pp. 1466-1470.
22)
Tavakkoli-Moghaddam,
R., Pourghaderi,
A.R. and Alinagian, M., A new heuristic algorithm for periodic vehicle routing
problems, Int. Annual Scientific Conf. on Operations Research in the Service
Industry, Saarland: Germany, September 5-7, 2007.
23)
Eskandarzadeh, S. and
Tavakkoli-Moghaddam, R.,
An extension of the relaxation algorithm for solving a special case of
capacitated arc routing problems, Proceeding of the 5th
Int. Conf. on Industrial Engineering,
Tehran: Iran, July 10-11, 2007.
24)
Tavakkoli-Moghaddam,
R., Safaei, N. and Sassani, F., Particle swarm optimization for
redundant reliability
problems with multiple component choice, Proceeding of the
7th Metaheuristics Int. Conf. (MIC 2007),
Montreal: Canada, June 25-29, 2007.
25)
Tavakkoli-Moghaddam, R.,
Gharehgozli, A.H., Rabbani, M. and Zaerpour, N., A fuzzy mixed-integer goal
programming model for a parallel machine scheduling problem, Proceeding of
the 8th WSEAS Int. Conf. on Fuzzy Systems (FS '07),
Vancouver: Canada, June 19-21, 2007, pp. 196-201.
26)
Gharehgozli, A.H., Tavakkoli-Moghaddam, R., Rabbani, M. and
Zaerpour, N., Acceptance or rejection of incoming orders by a fuzzy analytical
hierarchy process in make-to-order environments, Proceeding of the 8th
WSEAS Int. Conf. on Fuzzy Systems (FS '07), Vancouver: Canada, June 19-21,
2007, pp. 202-207.
27)
Tavakkoli-Moghaddam, R.,
Bagherpour, M., Noora, A.A. and Sassani, F., Application of fuzzy lead time to a
material requirement planning system, Proceeding of the 8th
WSEAS Int. Conf. on Fuzzy Systems (FS '07), Vancouver: Canada, June 19-21,
2007, pp. 208-213.
28)
Azadeh, A., Tavakkoli-Moghaddam, R. and Tarverdian, S.,
Electrical energy consumption estimation by genetic algorithm and analysis of
variance, Proceedings of the Int. Conf. on Renewable Energies and Power
Quality (ICREPQ`07), Sevilla: Spain, March 28-30, 2007.
29)
Tavakkoli-Moghaddam, R.,
Rahimi-Vahed, A.R. and Mirzaei, A.H., Solving a bi-criteria permutation flow
shop problem using immune algorithm, Proceedings of the First IEEE Symposium
on Computational Intelligence in Scheduling (CI-Sched 2007 a part of the IEEE
SSCI 2007), Honolulu: Hawaii, April 1-5, 2007, IEEE Computer Society Press,
pp. 49-56.
30)
Azadeh, A., Gaderi, S.F., Tavakkoli-Moghaddam, R., Tarverdian, S.
and Saberi, M., Integration of artificial neural networks and genetic algorithm
to predict electrical energy consumption in energy intensive sector,
Proceeding of the First Int. Conf. on E-Learning in Industrial
Electronics (ICELIE'06), Hammamet: Tunisia, December 18-20, 2006.
31)
Amlah, A., Towhidi, N. and Tavakkoli-Moghaddam, R., Application
of the fuzzy logic for determining strategic metals in Iran, Proceeding of
the Int. Conf. on Problem Solving Strategies and Techniques (PSST 2006),
Tehran: Iran, November 26-27, 2006.
32)
Tavakkoli-Moghaddam, R. and
Rahimi-Vahed, A.R., A memetic algorithm for multi-criteria sequencing problem
for a mixed-model assembly line in a JIT production system, Proceedings of
the IEEE Congress on Evolutionary Computation (CEC 2006), Edited by G.G.
Yen, S.M. Lucas, G. Fogel, G. Kendall, R. Salomon, y.-T. Zhang, C.A. Coello and
T.P. Runarsson, Vancouver: Canada, July 16-21,
2006, pp. 2993- 2998, IEEE Computer Society Press, ISBN: 0-7803-9487-9.
33)
Tavakkoli-Moghaddam, R. and
Safaei, N., An evolutionary algorithm for a single-item resource-constrained
aggregate production planning problem, Proceedings of the IEEE Congress on
Evolutionary Computation (CEC 2006), Edited by G.G. Yen, S.M. Lucas, G.
Fogel, G. Kendall, R. Salomon, Y.-T. Zhang, C.A. Coello and T.P. Runarsson,
Vancouver: Canada, July 16-21, 2006, pp. 2851- 2858, IEEE Computer
Society Press, ISBN: 0-7803-9487-9.
34)
Tavakkoli-Moghaddam, R.,
Ale-Ebrahim, N., Golnam, A., Vasei, M. and Ghazizadeh-Moghaddam, A., Analysis of
opportunities and challenges for R&D management and the role of the R&D society
for its improvement - A case study in Iran, Proceeding of the R&D
Management Conf., Lake Windermere: England, July 5-7, 2006,
35)
Tavakkoli-Moghaddam, R. and
Safaei, N., A generalized dynamic cell formation problem with fuzzy demand and
unreliable facilities, Proceeding of the 3rd Int. Conf. on Group
Technology / Cellular Manufacturing, Groningen: Netherlands, July 3-5,
2006, pp. 349-356.
36)
Safaei, N. and Tavakkoli-Moghaddam, R., Reliability
consideration in a cell formation problem with parallel-series configuration,
Proceeding of the 3rd Int. Conf. on Group Technology / Cellular
Manufacturing, Groningen: Netherlands, July 3-5, 2006, pp. 36-43.
37)
Javadian, N., Javadi, B.,
Tavakkoli-Moghaddam, R. and Safaei, N., Possibility linear programming to
uniform parallel machines scheduling with sequence-dependent setup times:
early/tardy penalties, Proceeding of the
36th Int. Conf. on Computers and Industrial Engineering,
Taipei: Taiwan, June 20-23, 2006, pp.
3488-3497.
38)
Saidi-Mehrabad, M.,
Safaei, N. and Tavakkoli-Moghaddam, R.,
A fuzzy parametric programming for cell
formation problem in uncertainty and dynamic conditions,
Proceeding of the 36th
Int. Conf. on Computers and Industrial Engineering,
Taipei: Taiwan, June 20-23, 2006, pp.
2703-2713.
39)
Tavakkoli-Moghaddam, R.,
Javadi, B. and Safaei, N., A fuzzy goal programming approach for a single
machine scheduling problem, Proceeding of the 9th WSEAS Int. Conf.
on Applied Mathematics, Istanbul: Turkey, May 27-29, 2006, pp. 140-145.
40)
Gharehgozli, A.H., Rabbani, M. and Tavakkoli-Moghaddam, R., A
proposed hierarchical production planning structure for combined MTS/MTO
environments, Proceeding of the 9th WSEAS Int. Conf. on Applied
Mathematics, Istanbul: Turkey, May 27-29, 2006, pp. 146-151.
41)
Tavakkoli-Moghaddam,
R., Khodadadegan, Y. and Haghnevis M.,
Efficient algorithm for a multi-criteria parallel machine scheduling problem
with sequence-dependent setup times, Proceeding of the 5th Int.
Symposium on Intelligent Manufacturing Systems, Sakarya: Turkey, May 29-31,
2006, pp. 159-167.
42)
Safaei,
N. and Tavakkoli-Moghaddam, R., The use of genetic algorithms for
multi-mode resource-constrained project planning with the diminishing returns,
Proceeding of the 5th Int. Symposium on Intelligent Manufacturing
Systems, Sakarya: Turkey, May 29-31, 2006, pp. 216-226.
43)
Tavakkoli-Moghaddam,
R. and Safaei, N., Modeling flexible
flow lines with blocking and sequence dependent setup time, Proceeding of the
5th Int. Symposium on Intelligent Manufacturing Systems, Sakarya:
Turkey, May 29-31, 2006, pp. 149-158.
44)
Safaei, N., Tavakkoli-Moghaddam, R. and Jabal-Ameli, S.M., A
generalized cell formation problem in dynamic environment with different inter
and intra-cell batch sizes, Proceeding of the 12th IFAC Symposium
on Information Control problems in Manufacturing, Saint Etienne: France, May
15-19, 2006, Vol. 2, pp. 401-406.
45)
Tavakkoli-Moghaddam, R.,
Safaei, N. and Torabi, S.A., Scheduling of flexible flow lines with blocking by
memetic algorithms, Proceeding of the 12th IFAC Symposium on
Information Control problems in Manufacturing, Saint Etienne: France, May
15-19, 2006, Vol. 3, pp. 21-26.
46)
Torabi, S.A., Jenabi, M., Fatemi Ghomi, S.M.T., Jolai, F. and
Tavakkoli-Moghaddam, R., Finite horizon ELSP in flexible flow lines with
unrelated parallel machines, Proceeding of the 12th IFAC Symposium
on Information Control problems in Manufacturing, Saint Etienne: France, May
15-19, 2006, Vol. 4, pp. 137-142.
47)
Tavakkoli-Moghaddam, R.,
Safaei, N. and Bidgoli-Kashani, S., Modeling
diminishing returns in multi-mode
resource-constrained project planning by genetic algorithm,
Proceeding of the 4th
Int. Conf. on Industrial Engineering, Tarbiat Modares University, Tehran,
11-12 December, 2005.
48)
Tavakkoli-Moghaddam, R.
and Safaei, N., A genetic algorithm based on queen bee for scheduling a flexible
flow line with blocking, Proceeding of
the 1st Tehran Int. Congress
on Manufacturing Engineering (TICME2005),
Tehran, 13-15 December, 2005.
49)
Rabbani, M. and Tavakkoli-Moghaddam, R., Multiple criteria
sequencing problem for mixed-model assembly line in a just-in-time production
system, Annual Int. Scientific Conf. on Operations Research, Bremen:
Germany, 7-9 September, 2005.
50)
Tavakkoli-Moghaddam, R.
and Vasei, M., A simulated annealing and a branch-and-bound algorithm for the
single machine sequencing to minimize the sum of maximum earliness and tardiness
considering idle insert, Proceeding of
the Third European Conf. onprivate
Intelligent Management Systems in Operations,
Salford: U.K., June 28-29, 2005, pp. 43-52.
51)
Tavakkoli-Moghaddam, R.
and Safaei, N., A new dynamic cell formation model with machine cost,
alternative process plan and cell size by simulated annealing,
Proceeding of the
Third European Conf. onprivate Intelligent Management Systems in Operations,
Salford: U.K., June 28-29, 2005, pp. 157-166.
52)
Tavakkoli-Moghaddam, R.,
Babakhani, M. and Safaei, N., A neural approach for constraint satisfaction of a
generalized job shop scheduling problem with fuzzy process times,
Proceeding of the
Third European Conf. onprivate Intelligent Management Systems in Operations,
Salford: U.K., June 28-29, 2005, pp. 256-265.
53)
Tavakkoli-Moghaddam, R.,
Rabbani, M., Saremi, A.and Safaei, N., Solving the backhaul vehicle routing
problem by genetic algorithms,
Proceeding of the 35th Int.
Conf. on Computers and Industrial Engineering,
Istanbul: Turkey, June 19-22, 2005, pp. 1905-1910.
54)
Tavakkoli-Moghaddam, R.,
Rabbani, M., Hakami, M. and Kazemi, M., Heuristic algorithms to solve a
bi-criteria traveling salesman problem with fuzzy time window,
Proceeding of the
35th Int. Conf. on Computers and Industrial Engineering,
Istanbul: Turkey, June 19-22, 2005, pp. 1899-1904.
55)
Tavakkoli-Moghaddam, R.,
Safaei, N. and Karimi, B., Scheduling of flexible flow lines with blocking by
genetic algorithms, Proceeding of the
35th Int. Conf. on Computers and Industrial Engineering,
Istanbul: Turkey, June 19-22, 2005, pp. 1911-1916.
56)
Tavakkoli-Moghaddam, R.,
Saidi-Mmehrabad, M. and Safaei, N.,
A new generalized cell formation model in
uncertainty and dynamic conditions by assuming routing flexibility and machine
relocation, Proceeding of the
35th Int. Conf. on Computers and Industrial Engineering,
Istanbul: Turkey, June 19-22, 2005, pp. 1893-1898.
57)
Rabbani, M., Ebadian, M., Jolai,
F., Tavakkoli-Moghaddam, R.
and Torabi, A., A new methodology for
managing order entry stage in make to order environments,
The 35th Int. Conf. on Computers and
Industrial Engineering, Istanbul,
Turkey, June 19 – 22, 2005, pp. 1591-1596.
58)
Tavakkoli-Moghaddam, R.,
Rabbani, M., Safaei, N. and Shariat, M.A., Vehicle routing problems with soft
time windows by an efficient method,
Proceeding of the First Int. Conf. on Modelling, Simulation and Applied
Optimization, Sharjah: U.A.E.,
February 1-3, 2005.
59)
Tavakkoli-Moghaddam, R.,
Safaei, N., Torfi, F. and Rasti, M., A new capacitated vehicle routing problem
to minimize the fleet cost and maximize capacity utilization,
Proceeding of the First Int. Conf. on Modelling,
Simulation and Applied Optimization,
Sharjah: U.A.E., February 1-3, 2005.
60)
Rabbani, M., Tavakoli-Moghddam, R., Miraliyari, S.-A. and Ebadian,
M., Bi-objective optimization of LLT production systems in batch manufacturing
environment: minimum WIP cost and resource overtime cost,
Proceeding of the First Int. Conf. on Modelling,
Simulation and Applied Optimization,
Sharjah: U.A.E., February 1-3, 2005.
61)
Tavakkoli-Moghaddam, R.
and Biyabani,
H., The use of genetic algorithms for aggregate
production planning, Proceeding of the
4th Int. Symposium on Intelligent Manufacturing Systems,
Sakarya: Turkey, September 6-8, 2004, pp. 683-692.
62)
Tavakkoli-Moghaddam, R.,
Rabbani, M. and Ghodratnama,
A., Allocating parts to manufacturing
cells by a meta heuristic algorithm,
Proceeding of the 4th Int.
Symposium on Intelligent Manufacturing Systems,
Sakarya: Turkey, September 6-8, 2004, pp. 693-702.
63)
Tavakkoli-Moghaddam, R.,
Jolai,
F., Haji, R. and Vaziri, F., An efficient
algorithm for stochastic job shop scheduling problems,
Proceeding of the
1st Int. Conf. on Industrial Engineering,
Vol. 2, Tehran: Iran, July 13-4, 2004, pp. 15-28.
64)
Tavakkoli-Moghaddam, R.,
Rabbani, M. and Taghavi, S.-M., Solving manpower scheduling problems by
simulated annealing, Proceeding of the
33rd Int. Conf. on Computers and Industrial Engineering,
Jeju Island, Korea, March
25-27,
2004.
18)
Rabbani, M., Tavakkoli-Moghaddam, R. and Mohammadipour, M., Fuzzy
mathematical programming application in job-shop scheduling,
Proceeding of the
33rd Int. Conf. on Computers and Industrial Engineering,
Jeju Island, Korea, March
25-27,
2004.
65)
Razmi, R., Tavakkoli-Moghaddam, R., and Karbasian, S., Developing
a comprehensive information system for a car company within supply chain,
Proceeding of the
33rd Int. Conf. on Computers and Industrial Engineering,
Jeju Island, Korea, March
25-27,
2004.
66)
Tavakkoli-Moghaddam, R.
and Daneshmand-Mehr, M., A computer simulation model for job shop scheduling
problems minimizing makespan,
Proceeding of the 30th Int.
Conf. on Computers and Industrial Engineering,
Tinos Island, Greece, June 29
- July 2, 2002, pp. 887-892.
67)
Tavakkoli-Moghaddam, R.
and Mardan, S., An evolutionary algorithm
for solving cell formation
problems considering production volume and process sequence, Proceeding of
the 30th Int. Conf. on
Computers and Industrial Engineering,
Tinos Island, Greece, June 29
- July 2, 2002, pp. 893-898.
68)
Rabbani, M. and Tavakkoli Moghaddam, R., A new approach to
computation completion
time distribution function of stochastic pert networks, Proceeding of the 1st
Int. NAISO Congress on Autonomous Intelligent Systems, Geelong: Australia,
February 12-15, 2002.
69)
Tavakkoli-Moghaddam, R. and
Sheibani, K., The use of an evolutionary computing for
solving
course scheduling problems, Proceeding of the 1st Int. NAISO
Congress on Autonomous Intelligent Systems, Geelong: Australia, February
12-15, 2002.
70)
Tavakkoli-Moghaddam, R.;
Rabbani, M. and Ali-Hosseini, A.R., Solving location-allocation problem
by an evolutionary algorithm, Proceeding of the 1st Int. NAISO
Congress on Autonomous Intelligent Systems, Geelong: Australia, February
12-15, 2002.
71)
Azadeh, A.; Tavakkoli-Moghaddam, R. and Sharifi, S., Design of a
human-centered expert system for strategic planning, Proceeding of the 5th
Int. Conf. on Engineering Design & Automation, Las Vegas: USA, August 5-8,
2001, pp. 626-632.
72)
Tavakkoli-Moghaddam, R.,
Using GA to solve a continuous plane model to machine layout
problems,
Proceeding of the
7th Int. Conf. on Industrial Engineering and Engineering Management,
November 28-30, 2000, Guangzhou: China, pp. 237-243.
73)
Tavakkoli-Moghaddam, R.,
Shayan, E. And Nagarajah, R., Using GA to solve a continuous
plane
model to machine layout problems,
Proceeding of the 26th Int.
Conf. on Computers and Industrial Engineering,
December 8-10, 1999, Melbourne: Australia, pp. 583-587.
74)
Tavakkoli-Moghaddam, R.,
A genetic algorithm-based heuristic for manufacturing facilities layout
problems, Proceeding of the
3rd Int. Mechanical Engineering Conf.,
Tehran: Iran, May 18-20, 1998, pp. 525-532.
75)
Masood, S.H. and Tavakkoli-Moghaddam, R., Design of precision
cylindrical cams suitable for applying CAD/CAM,
Proceeding of the
3rd Int. Mechanical Engineering Conf.,
Tehran: Iran, May 18-20, 1998, pp. 513-518.
76)
Tavakkoli-Moghaddam, R.
and Shayan, E., A genetic algorithm for solving facilities layout problems,
Proceeding of the
4th Int. Conf. of the Association of Asian-Pacific Operational
Research Societies, Melbourne:
Australia, November 3 – December 4, 1997.
77)
Tavakkoli-Moghaddam, R.
and Shayan, E., An analysis of the genetic operators affecting the performance
of genetic algorithms for facilities layout problems,
Proceeding of the
7th Int. Conf. on Manufacturing Engineering,
Cairns: Australia, September 15-17, 1997, pp. 51-60.
78)
Tavakkoli-Moghaddam, R.;
Shayan, E. and Nagarajah, R., Cell formation and layout issues in cellular
manufacturing systems: a survey of developments,
Proceeding of the
Int. Conf. on the Application and Implementing of Advanced Engineering & Design,
Manufacturing, and Automation Technology,
Jakarta: Indonesia, December 12-13, 1996, pp. 84-92.
79)
Tavakkoli-Moghaddam, R.
and Shayan, E., Manufacturing facilities design: A state-of-the-art survey of
traditional modelling, Proceedings of the 2nd Int. Mechanical
Engineering Conf., Shiraz: Iran, May 14-17, 1996, pp. 887-894.
80)
Tavakkoli-Moghaddam, R.
and Shayan, E., Manufacturing facilities design: A state-of-the-art survey of
advanced modelling, Proceedings of the 2nd Int. Mechanical
Engineering Conf., Shiraz: Iran, May 14-17, 1996, pp. 877-885.
81)
Tavakkoli-Moghaddam, R.
and Colville, E.J., Production planning derived from a manufacturer’s budget to
provide man, machine and material requirements, Proceedings of the 2nd
Int. Mechanical Engineering Conf., Shiraz: Iran, May 14-17, 1996, pp.
925-933.
الف) كتاب
1)
رضا توكلي مقدم و
ابراهيم وحدت، پايش، عيب يابي و نگهداري موتور ديزل، انتشارات آموزش و تحقيقات
صنعتي ايران، 1384.
2)
رضا توكلي مقدم و
رضا قاسمي، مديريت مواد و انبارداري كالا، انتشارات راد انديش نو، 1385.
ب) مجله علمي - پژوهشي
1)
رضا توكلي مقدم،
مسعود رباني و محمدعلي بهشتي، كمينهسازي هزينه توقف خط مونتاژ با استفاده از
الگوريتم ژنتيك، استقلال، جلد 27، شماره 1، صص 49-35، 1387.
2)
مسعود رباني، رضا توکلي مقدم، ياسمن خدادادگان و معيد حق نويس،
ارائه مدل توسعه يافته انعطافپذيري و کارايي
سازمان در محيط فازي، نشريه فني، دانشگاه تهران، جلد 41، شماره 7، صص 896-887،
بهمن 1386.
3)
فريبرز جولاي، رضا توکلي مقدم، جعفر رزمي و پدارم صهبا، ارايه مدل و توسعه
الگوريتم حل يک مساله کنترل موجودي با در نظر گرفتن هزينه حمل و نقل، نشريه فني،
دانشگاه تهران، جلد 41، شماره 7، صص 885-873، بهمن 1386.
4)
رضا توكلي مقدم،
امير شكاري و محمد سهرابي، كاربرد مهندسي ارزش جهت بهبود عملكرد امور مشتركين شركت
آب و فاضلاب مازندران، مجله آب و فاضلاب، جلد 17، شماره 2، صص 70-64، تابستان 1386.
5)
رضا توكلي مقدم و
نيما صفائي، ارائه يك رويكرد فازي - عصبي جهت ارضاي قيود در مسأله زمانبندي كار
كارگاهي تعميم يافته با فرض زمان پردازش فازي، مجله بينالمللي علوم مهندسي،
دانشگاه علم و صنعت ايران، جلد 17، شماره 6، صص 77-67، 1385.
6)
رضا توكلي مقدم
و شيدا اسلامي، ارائه يک مدل رياضي جديد براي برنامه زمانبندي نيروي انساني و حل آن
با استفاده از الگوريتم ژنتيک،
مجله
فصلنامه علمي - پژوهشي شريف، دانشگاه صنعتي شريف، شماره 36، صص 31-21، زمستان 1385.
7)
رضا توكلي مقدم،
مسعود رباني، محمد علي شريعت و نيما صفائي، حل مسئله مسيريابي وسايل نقليه با
پنجرههاي زماني نرم با استفاده از يك الگوريتم فرا ابتكاري تلفيقي، نشريه فني،
دانشگاه تهران، جلد 40، شماره 4، صص 476-469، مهر 1385.
8)
رضا توكلي مقدم،
جعفر رزمي، فريبرز جولاي و محمد صفاري، حل مسئله زمانبندي جريان کارگاهي در حالت
زمان فرآيند غير قطعي و موعد تحويل احتمالي با استفاده از تئوري امکان و منطق فازي،
نشريه فني، دانشگاه تهران، جلد 40، شماره 4، صص 476-469، مهر 1385.
9)
مسعود رباني،
رضا توكلي مقدم
و سعيد داودآبادي فراهاني، روشي جديد براي تخمين ميانگين و واريانس زمان فعاليت در
شبكه پرت، نشريه فني، دانشگاه تهران، جلد 40، شماره 4، صص 521-513، مهر 1385.
10)
محمد علي آزاده،
رضا توكلي مقدم
و سعيد جعفري هرندي، مدلسازي و ارزيابي مهندسي مجدد در مديريت خريد يک شركت توليدي
- تحقيقاتي توسط شبيهسازي فرايند کسب و کار، نشريه فني، دانشگاه تهران، جلد 40،
شماره 4، صص 468-457، مهر 1385.
11)
فريبرز جولاي،
رضا توكلي مقدم
و فرشيد آزاديان، زمانبندي ماشينهاي موازي براي كارهاي قابل تقسيم با درنظرگرفتن
زمان راهاندازي وابسته به توالي، نشريه فني، دانشگاه تهران، جلد 40، شماره 4، صص
506-495، مهر 1385.
12)
سيد حسامالدين ذگردي، محمد مهدي سپهري،
رضا توكلي مقدم
و ابوالفضل سميعي، طراحي مدل توسعه يافته براي مسأله پوشش مجموعه و حل آن با
الگوريتم ژنتيك
(GA)،
مجله بينالمللي علوم مهندسي، دانشگاه علم و صنعت ايران، جلد 16، شماره 4، صص
124-115، زمستان 1384.
13)
رضا توكلي مقدم و
نيما صفائي، طـراحي سيستم تـوليد سلولي در شرايط پوياي احتمالي و حل آن با استفاده
از الگوريتم
Simulated Annealing،
نشريه دانشكده مهندسي، دانشگاه فردوسي مشهد، سال 17، شماره 2، صص 14-1، 1384.
14)
رضا توكلي مقدم
و امير شكاري، حل مسايل زمانبندي تك ماشين چند معياره با تاكيد بر افزايش رضايت
مشتري به كمك الگوريتم ابتكاري، مجله بينالمللي علوم مهندسي، دانشگاه علم و صنعت
ايران، جلد 16، شماره 3، صص 40-33، پائيز 1384.
15)
رضا توكلي مقدم،
مسعود رباني و سيد مسعود تقوي، حل مساله برنامه زمانبندي نيروي انساني با استفاده
از روش
Simulated Annealing،
مجله بينالمللي علوم مهندسي، دانشگاه علم و صنعت ايران، جلد 16، شماره 2، صص
11-1، تابستان 1384.
16)
رضا توكلي مقدم،
سيد محمدتقي فاطميقمي، فهيمه افسري و نيما صفايي، ارايه يك مدل رياضي زمانبندي
نيروي انساني و حل آن با استفاده از روش جستجوي ممنوع
(TS)
، نشريه اميركبير، سال 16، شماره ب-61، صص 22-13، بهار 1384.
17)
رضا توكلي مقدم،
محمدتقي فاطميقمي، علي فيضي و
مرتضي
واسعي، تعيين توالي خطوط مونتاژ چندمدلي به منظور حداقلكردن طول خط و هموارسازي
مصرف قطعات با استفاده از الگوريتم ژنتيك
(GA)،
نشريه اميركبير، سال 16، شماره ب-61، صص 34-23، بهار 1384.
18)
سيد محمد تقي فاطمي قمي نگين اسـدي و
رضا توكلي مقدم،
طراحي يك مدل موجودي چند معياره - چند تصميمگيرنده در يك ساختار غير سري زنجيره
عرضه با تقاضاي احتمالي، نشريه اميركبير، سال 16، شماره ب-61، صص 97-87، بهار 1384.
19)
رضا توكلي مقدم،
مسعود رباني و نيما صفايي، حل مسأله پوشش مجموعه با استفاده از الگوريتمSimulated
Annealing،
نشريه اميركبير، سال 15، شماره د-59، صص 19-10، تابستان 1383.
20)
رضا توكلي مقدم،
مسعود رباني و مصطفي ايمان عيني، حل مسايل تشكيل سلول توليدي در شرايط پوياي
احتمالي با استفاده از يک روش تلفيقي ابتکاري، نشريه اميركبير، سال 15، شماره د-54،
صص 451-435، بهار 1383.
21)
مسعود رباني،
رضا توكلي مقدم
و محمد رنجبر، يك الگوريتم كارا براي حل مساله برنامهريزي كارگاهي دو هدفه در حالت
فازي با استفاده از الگوريتم ژنتيك و روش دادهكاوي اطلااعات، نشريه اميركبير، سال
15، شماره د-54، صص 590-570، بهار 1383.
22)
مسعود رباني،
رضا توكلي مقدم
و مريم محمديپور، توسعه يك الگوريتم ابتكاري براي حل مسائل زمانبندي با در نظر
گرفتن شرايط عدم قطعيت، مجله بينالمللي علوم مهندسي، دانشگاه علم و صنعت ايران،
جلد 15، شماره 1، صص 42-27، بهار 1383.
23)
رضا توكلي مقدم،
محسن صادق عملنيك و محمد علي رفعتي، متدولوژي بكارگيري روش تحليل پوششي دادهها
(DEA)
در سازمانهاي تحقيقاتي، نشريه فني، دانشگاه تهران، جلد 38، شماره 1، صص 185-175،
ارديبهشت 1383.
24)
ناصر توحيدي،
رضا توكلي مقدم
و سيد ابراهيم وحدت، استفاده از تئوري فازي براي انتخاب فولاد ابزار مناسب، نشريه
فني، دانشگاه تهران، جلد 37، شماره 3، صص 434-427، آذر 1382.
25)
رضا توكلي مقدم،
مسعود رباني و احمدرضا علي حسيني، يك روش ابتكاري كارآمد براي حل مسائل پوشش
مجموعه، مجله بينالمللي علوم مهندسي، دانشگاه علم و صنعت ايران، جلد 14، شماره
4، صص 106-95، پائيز 1382.
26)
رضا توكلي مقدم،
مير بهادرقلي آريانژاد و امير حسين لطيفيان، ”حل مدل طراحي سيستم هاي توليد سلولي
با استفاده از روش جستجوي ممنوع
(TS)“،
مجله فني و مهندسي مدرس، شماره 11، صص 77-65، 1382.
ج) مجله علمي - ترويجي
1)
رضا توكلي مقدم
و مريم دانشمندمهر، حل مسايل زمانبندي كار كارگاهي
با استفاده از شبيه سازي كامپيوتري، پيام باور - نشريه فني و مهندسي دانشگاه امام
حسين (ع)، شماره 20، صص49-37، 1384.
2)
رضا توكلي مقدم
و امير شكاري، مهندسي ارزش؛ ابزار قدرتمند بهرهوري، ماهنامه تدبير، سازمان مديريت
صنعتي، سال چهاردهم، شماره 132، صص 33-28، ارديبهشت 1382.
3)
رضا توكلي مقدم،
بررسي روش محكزني در يك نمونه از صنايع، فرايند مديريت و توسعه، شماره 56 و 57، صص
21-14، تابستان و پاييز 1381.
4)
رضا توكليمقدم
و رضا سبحاني، راههاي مختلف شناخت محيطي بازار هدف در مديريت استراتژيك- مطالعه
موردي صادرات نرم افزار، فصلنامه مديريت و توسعه، دوره چهارم، شماره 13، صص 86-68،
1381.
5)
رضا توكليمقدم،
حسين امينيراد و شكوفه شيخ حسيني، مقايسه ميزان آب و انرژي مصرفي در ماشينهاي
لباسشويي ايران و اروپا، ماهنامه مجله استاندارد، سال سيزدهم، شماره 129، صص
38-34، 1381.
6)
رضا توكلي مقدم
و سيد نادر حسنلي، طراحي الگويي ملي جهت ارتقاي كيفيت، فصلنامه مديريت دولتي،
شماره 52، صص 29-21، 1380.
7)
ستاره مردان و
رضا توكلي مقدم،
بررسي و مقايسه روشهاي مختلف حل مسائل تكنولوژي گروهي، فصلنامه مجله مهندسي
صنايع، دانشگاه صنعتي شريف، سال هفتم، شماره اول و دوم، صص 52-48، 1380
8)
بهارك بيدختي،
رضا توكلي مقدم
و محمد علي آزاده، شبيه سازي
JIT
در يكي از خطوط يك واحد توليد كننده خودرو، فصلنامه مجله مهندسي صنايع، دانشگاه
صنعتي شريف، سال هفتم، شماره اول و دوم، صص 47-38، 1380.
د) کنفرانس داخلي
1)
حسينعلي حسن پور، مسعود مصدق خواه
و
رضا توکلي مقدم،
به كاركيري الگوريتمهاي فراابتكاري در حل مسائل بهينهسازي تركيبي در حوزه دفاعي،
دومين كنگره مشترك سيستمهاي فازي و هوشمند ايران، دانشگاه صنعتي مالك اشتر ،
تهران، 9-7 آبان 1387.
2)
حسين عموزاده خليلي،
رضا توکلي مقدم
و مريم جعفري، تبيين و تحليل عامل خلاقيت جهت پايداري و رقابتپذيري بنگاههاي
کارآفرين، همايش ملی تعاون و کارآفرينی، تهران 24 و 25 مهر 1387.
3)
حسين عموزاد خليلي، رضا
توکلي مقدم
و سپيده آياني، مديريت استراتژيك پروژهها در تخصيص منابع محدود همزمان با
پروژهها، كنفرانس بينالمللي مديريت استراتژيك پروژهها، تهران 22 و 23 مرداد
1387.
4)
حسين عموزاد خليلي،
رضا توکلي مقدم
و فرانك مطلبي، اثرات بهبود امنيت بانكداري در جلب رضايت مشتريان الكترونيكي، دومين
كنفرانس جهاني بانكداري الكترونيكي، تهران، 19 و 20 مرداد 1387.
5)
رضا توکلي مقدم
و بنيامين کريمي، مدل مفهومي براي تهيه نقشه دانش در مراكز تحقيقاتي، هفتمين همايش
مراكز تحقيق و توسعه صنايع و معادن، تهران، 9 و 10 تير 1387.
6)
حسين عموزاد خليلي،
رضا توکلي مقدم
و محمد رضا پاپن، بررسي اثر تحقيق و توسعه بر بهرهوري کل عوامل توليد، هفتمين
همايش مراكز تحقيق و توسعه صنايع و معادن، تهران، 9 و 10 تير 1387.
7)
حسين عموزاد خليلي،
رضا توکلي مقدم
و سپيده آياني، بکارگيري مديريت صحيح تکنولوژي در مسير توسعه و رقابتپذيري
بنگاهها، هفتمين همايش مراكز تحقيق و توسعه صنايع و معادن، تهران، 9 و 10 تير
1387.
8)
محمد رضا پاپن،
رضا توکلي مقدم
و حسين عموزاد خليلي، استراتژي کشورهاي صنعتي در اشاعه و گسترش
R&D
به کشورهاي در حال توسعه، هفتمين همايش مراكز تحقيق و توسعه صنايع و معادن، تهران،
9 و 10 تير 1387.
9)
حسين عموزاد خليلي،
رضا توکلي مقدم
و رضا عموزاد، خليلي چالشها و مزاياي استفاده از
CNG
در صرفهجويي اقتصادي و کاهش آلودگي محيط، همايش ملي سوخت، انرژي و محيط زيست،
تهران، 7 و 9 خرداد 1387.
10)
رضا توکلي مقدم،
محمد تقي تقوي فرد، حسين عموزاد خليلي و صفدر خسروشاهي، طراحي مجدد محيط و فرآيندها
جهت افزايش ايمني و بهرهوري، نخستين کنفرانس بين المللي ارگونومي ايران، تهران، صص
352-344، 18 و 19 ارديبهشت 1387.
11)
حسين عموزاده خليلي،
رضا توکلي مقدم
و سيد ميثم موسوي، ايمني صنعتي ابزاري کارآمد در گذر از ريسكها و حوادث كاري،
اولين کنفرانس بين المللي جايگاه ايمني صنعتي، بهداشت حرفهاي و محيط زيست در
سازمانها، اصفهان، 18 و 19 ارديبهشت 1387.
12)
حسين عموزاده خليلي، سپيده آياني و
رضا توکلي مقدم،
تبيين و تحليل عوامل کارآ در آموزش کارآفريني و راهکار بهبود فرايندها، اولين
كنفرانس ملي كارآفريني، خلاقيت و سازمانهاي آينده، تهران، 7 و 8 اسفند 1386.
13)
رضا توکلي مقدم،
حسين عموزاده خليلي و مريم جعفري، بررسي نقش و ضرورت خلاقيت در کارآفريني جهت
پايداري و رقابتپذيري بنگاهها، اولين كنفرانس ملي كارآفريني، خلاقيت و سازمانهاي
آينده، تهران، 7 و 8 اسفند 1386.
14)
رضا توکلي مقدم،
سپيده آياني و حسين عموزاده خليلي، بررسي عوامل اثر بخش در آموزش كارآفريني و
راهكار گذر از موانع، همايش ملي آموزش عالي و كارآفريني - گذشته، حال و آينده،
سمنان، 6 اسفند 1386.
15)
حسين عموزاده خليلي، سپيده آياني و
رضا توکلي مقدم،
مديريت استراتژيک در کيفيت زندگي کاري سرمايههاي انساني و توسعه پايدار، دومين
همايش مديريت سرمايههاي انساني با رويكرد كاربردي، تهران، 1 و 2 اسفند 1386.
16)
سامان اسكندرزاده و
رضا توكلي مقدم،
تئوري برنامهريزي منوتراپيك جداناپذير و استفاده از آن در حل مسائل
SDARP،
اولين کنفرانس بين المللي انجمن ايراني تحقيق در عمليات، دانشگاه كيش، كيش، 10-8
بهمن 1386.
17)
مجيد خليلي،
بهمن نادري و رضا توکلي مقدم، مساله زمانبندي جريان كارگاهي با زمان حمل
بين مراحل به منظور کمينهسازي متوسط زمان تکميل کارها با الگوريتمهاي فراابتکاري،
اولين کنفرانس بين المللي
انجمن ايراني تحقيق در عمليات، دانشگاه كيش، كيش، 10-8 بهمن 1386.
18)
رضا توکلي
مقدم، سيد
ميثم موسوي و سيد محمد حسين مجتهدي، مکانيابي انبارهاي موقت در يک واحد توليدي
مبتني بر تصميمگيري چند معياره فازي،
اولين کنفرانس بين المللي انجمن
ايراني تحقيق در عمليات، دانشگاه كيش، كيش، 10-8 بهمن 1386.
19)
مهدي اميري عارف و
رضا توکلي مقدم،
شبيهسازي سيستمهاي حمل و نقل مواد با در نظر گرفتن محدوديتهاي عرضه و تقاضا و
زمانهاي حمل و نقل، اولين کنفرانس بين المللي انجمن ايراني تحقيق در عمليات،
دانشگاه كيش، كيش، 10-8 بهمن 1386.
20)
رضا توکليمقدم
و مليحه آرامون، به کارگيري رويکرد الگوريتم ممتيک براي حل مسئله چيدمان تسهيلات در
سيستم توليد سلولي، دومين كنگره بينالمللي مهندسي ساخت و توليد ايران، دانشگاه علم
و صنعت ايران، تهران، 22-19 آذر 1386.
21)
رضا توکليمقدم
و مليحه آرامون، حل مساله زمانبندي تك ماشين با هدف حداقل کردن کل ديركرد وزني با
الگوريتم ژنتيك، دومين كنگره بينالمللي مهندسي ساخت و توليد ايران، دانشگاه علم و
صنعت ايران، تهران، 22-19 آذر 1386.
22)
رضا توکليمقدم
و مريم رحيمي، الگوريتم بهينهسازي انبوه اجزا براي حل مسئله طراحي چيدمان حلقهاي
در سيستمهاي توليدي انعطافپذير، دومين كنگره بينالمللي مهندسي ساخت و توليد
ايران، دانشگاه علم و صنعت ايران، تهران، 22-19 آذر 1386.
23)
رضا توکلي مقدم،
سيد ميثم موسوي و حسين عموزاد خليلي، مديريت استراتژيک ريسک در زنجيره تامين
کنندگان، دومين
كنفرانس بيناللملي مديريت استراتژيك، تهران، 22 و 23 آبان ماه 1386.
24)
حسينعلي حسن پور، مسعود مصدق خواه
و
رضا توکلي مقدم،
طراحي دو مدل رياضي براي مساله مکان يابي- مسيريابي احتمالي، پنجمين
كنفرانس بيناللملي مهندسي
صنايع، دانشگاه علم و صنعت، تهران، 20 و 21 تيرماه 1386.
25)
محمد
مهدي
مبيني
و
رضا
توکلي
مقدم،
بکارگيري
الگوريتم
شبيه
سازي
تبريد
در
مسئله
زمانبندي
تک
ماشين با
موعد
تحويل
مشترک، پنجمين
كنفرانس بيناللملي مهندسي
صنايع، دانشگاه علم و صنعت، تهران، 20 و 21 تيرماه 1386.
26)
فرشيد
نورمحمدي، فاطمه
جليلي
بجارينه،
رضا
توکلي
مقدم
و محسن
قانون، مدل
کشف
و
بهبود علل
خطاهاي
بحراني
در
توليد
لوله
هاي
گاز بر
پايه
تکنيک
FMEA
و
اصول
تفکرناب، پنجمين
كنفرانس بيناللملي مهندسي
صنايع، دانشگاه علم و صنعت، تهران، 20 و 21 تيرماه 1386.
27)
عبدالحميد صفايي قاديكلايي،
رضا توكلي مقدم
و مسعود نيازي، طراحي سيستم اندازهگيري عملكرد مناطق شركت آب و فاضلاب مازندران،
سومين
كنفرانس
ملي
مديريت
عملكرد، دانشگاه تهران، 25 و 26 ارديبهشت 1386.
28)
رضا توكلي مقدم،
محمد شاهعليزاده كلخوران و كاوه خليلي دامغاني، حل مسائل زمانبندي پروژهها با
منابع محدود با استفاده از الگوريتم مورچگان اصلاح شده، اولين كنفرانس
بيناللملي مديريت پروژه، 10 و 11 ارديبهشت 1386.
29)
رضا توکليمقدم
و رمضان مهديزاده، ارائه مدلي بمنظور تعيين عوامل موثر در شروع موفقيت برنامهريزي
استراتژيک، دومين همايش ملي مديريت استراتژيك در سازمانهاي استراتژي محور، تهران،
3 و 4 بهمن 1385.
30)
رضا توکليمقدم،
ياسمن خدادادگان و معيد حق نويس، ارائه يک مدل ترکيبي براي انتخاب ماشينهاي موازي و
زمانبندي کارها، چهارمين كنفرانس بيناللملي مهندسي صنايع، دانشگاه تربيت مدرس،
تهران، 20 و 21 آذر 1384.
31)
رضا توکليمقدم،
فريبرز جولاي و هاشم وحداني، ارايه الگوريتمي كارا براي حل مساله فلوشاپ تركيبي با
محدوديت انبارههاي مياني، چهارمين كنفرانس بيناللملي مهندسي صنايع، دانشگاه تربيت
مدرس، تهران، 20 و 21 آذر 1384.
32)
رضا توکليمقدم
و سامان اسكندرزاده، مسايل حمل و نقل عمومي با تقاضاي تفكيكپذير، چهارمين كنفرانس
بيناللملي مهندسي صنايع، دانشگاه تربيت مدرس، تهران، 20 و 21 آذر 1384.
33)
رضا توکليمقدم،
ياسر صميمي، حميد اسماعيلي و نيما عظيمزاده، بررسي و مقايسه عملكرد روشهاي ابتكاري
براي حل مدل مكانيابي
Maximal Covering
، چهارمين كنفرانس بيناللملي مهندسي صنايع، دانشگاه تربيت مدرس، تهران، 20 و 21
آذر 1384.
34)
رضا توکليمقدم،
مهدي علينقيان و محمد رضا تقي زاده، ارائه يک مدل برنامه ريزي رياضي به منظور مکان
يابي انبارها در مسيريابي وسايل نقليه يک واحد توليدي، اولين كنگره بينالمللي
(هفتمين کنگره ملي) مهندسي ساخت و توليد ايران، دانشگاه تربيت مدرس، تهران، 25-22
آذر 1384.
35)
رضا توکليمقدم
و بنيامين کريمي، ارايه يك نقشه راه براي پيادهسازي مديريت دانش در سازمانها،
پنجمين همايش مراكز تحقيق و توسعه صنايع و معادن، تهران، 1 و 2 آذر 1384.
36)
رضا توکليمقدم
و فرضعلي حيدري فيروزجايي، نقش مديريت دانش و فناوري اطلاعات در واحدهاي تحقيق و
توسعه، پنجمين همايش مراكز تحقيق و توسعه صنايع و معادن، تهران، 1 و 2 آذر 1384.
37)
رضا توکليمقدم،
امير شكاري و عبدالله مهرابي، كاربرد مهندسي ارزش در پروژه بهينهسازي مجتمع
پتروشيمي رازي -
واحد اسيد فسفريك، دومين كنفرانس ملي مهندسي ارزش، دانشگاه علم و صنعت، تهران، 2 و
3 آذر 1384.
38)
رضا توكليمقدم
و فرضعلي حيدري فيروزجايي، اولويت بندي عوامل موثر بر موفقيت انتقال تكنولوژي در
كشورهاي در حال توسعه - مطالعه موردي: مخابرات ايران، دومين كنفرانس مديريت
تكنولوژي، شركت توانير، صص 262-253، 28-26 ارديبهشت 1384.
39)
رضا توكليمقدم
و كيانوش حسني نژاد، بررسي مشكلات و موانع تجارت الكترونيكي در ايران، اولين
كنفرانس ملي لجستيك و زنجيره تامين، تهران، 26 و 27 بهمن 1383.
40)
جعفر رزمي،
رضا توکلي مقدم
و بابک ياري، اثرات بکارگيري تجارت الكترونيك در مديريت زنجيره تامين و چالشهاي
پيشرو، اولين كنفرانس ملي لجستيك و زنجيره تامين، تهران، 26 و 27 بهمن 1383.
41)
مهدي غضنفري،
رضا توكليمقدم
و نيما صفايي، طراحي يک سيستم فازي براي کنترل آتش تسليحات در شرايط محاصره،
پنجمين كنفرانس سيستمهاي فازي ايران، دانشگاه امام حسين (ع)، صص 37-29، 19-17
شهريور 1383.
42)
رضا توكليمقدم
و نيما صفايي، ارايه يك مدل توليد سلولي در شرايط پوياي فازي و حل آن با الگوريتم
ژنتيك، اولين كنفرانس بينالمللي مهندسي صنايع، دانشگاه صنعتي اميركبير، انتخاب
بهترين مقاله، جلد اول، صص 187-175، 1383.
43)
رضا توكليمقدم،
مسعود رباني و دانيال شفيعي، حل مسايل زمانبندي فلوشاپ با استفاده از
Simulated Annealing،
اولين كنفرانس بينالمللي مهندسي صنايع، دانشگاه صنعتي اميركبير، جلد اول، صص
194-188، 1383.
44)
رضا توكليمقدم،
امير شكاري و فرزاد ثقفي، حل مساله زمانبندي تكماشين با هدف سه معياره توسط
الگوريتمهاي ابتكاري و ژنتيك، اولين كنفرانس بينالمللي مهندسي صنايع، دانشگاه
صنعتي اميركبير، جلد اول، صص 208-195، 1383.
45)
رضا توكليمقدم
و فرضعلي حيدري فيروزجايي، نقش فناوري اطلاعات در كاهش هزينههاي كيفيت سازمانها و
شركتها، پنجمين كنفرانس مديران كيفيت، تهران، 14 و 15 تير 1383.
46)
رضا توكليمقدم
و امير شكاري، روش مهندسي ارزش جهت مطالعه پروژههاي ساخت، دوازدهمين كنفرانس
سالانه مهندسي مكانيك، دانشگاه تربيت مدرس، 29 تا 31 ارديبهشت 1383.
47)
رضا توكلي مقدم
و مهندس علي علينژاد، بررسي جايگاه مديريت تحقيق و توسعه (R&D)
در رشد اقتصادي بنگاه با رويكرد بهرهوري، چهارمين همايش مراكز تحقيق و توسعه
صنايع و معادن، انتخاب بهترين مقاله، 19-18 آذر 1382.
48)
رضا توكلي مقدم،
سيد نادر حسنلي و يونس بالو، طراحي و پياده سازي سيستم نگهداري و تعميرات بهرهور
جامع در شركت نساجي بابكان، دومين كنفرانس ملي نگهداري و تعميرات، 26 الي 27 تير
1382.
49)
رضا توكلي مقدم
و مهندس فرزانه وزيري، بهبود اساسي فرايندها با استفاده از شش سيگما (6d)،
چهارمين كنفرانس مديران كيفيت، تهران 23 و 24 تير 1382.
50)
رضا توكلي مقدم
و احمد ساراني، چهارچوبي براي توسعه و استفاده از سيستمهاي اطلاعاتي اجرايي
(EIS)،
كنفرانس سراسري كامپيوتر، دانشگاه فردوسي مشهد، 19 الي 21 آذر 1381، صص 109- 99.
51)
امير آذرون،
رضا توكلي مقدم
و لاله مهراد پي، كنترل نرخ بهينه سرويس دهي در يك مركز خدماتي، دومين كنفرانس ملي
مهندسي صنايع، دانشگاه يزد، 29 و 30 بهمن 1381، صص 1-10.
52)
رضا توكلي مقدم
و نيكبخش جواديان و نيما صفائي، طـراحي سيستم توليد سـلولي در شـرايـط پــوياي
احتـمالي و حـل آن توسـط
Simulated
Annealing،
دومين كنفرانس ملي مهندسي صنايع، دانشگاه يزد، 29 و 30 بهمن 1381، صص 120-112.
53)
رضا توكلي مقدم
و مسعود رباني و علي قدرت نما، استفاده از يك الگوريتم كارآمد براي طراحي سيستم
توليد سلولي با در نظر گرفتن زمان پردازش سلول هاي عمومي و خاص، دومين كنفرانس ملي
مهندسي صنايع، دانشگاه يزد، 29 و 30 بهمن، 1381، صص 129-121.
54)
مسعود رباني،
رضا توكلي مقدم
و مريم محمديپور، استفاده از يك الگوريتم ژنتيك در رويكرد انتقال گلوگاه براي حل
مساله زمانبندي كارگاهي فازي، دومين كنفرانس ملي مهندسي صنايع، دانشگاه يزد، 29 و
30 بهمن، 1381، صص 202-193.
55)
جواد روحي،
رضا توكلي مقدم
و قاسم شهابي، كاهش تلفات پيك شبكه انتقال گلستان با انتخاب مسير بهينه جريان،
شانزدهمين كنفرانس بين المللي برق، سازمان توانير - وزارت نيرو، 30 مهر تا 2
آبان1380، صص 51-58.
56)
ستاره مردان و
رضا توكلي مقدم،
حل مساله تشكيل سلول با استفاده از الگوريتم ژنتيك، اولين كنفرانس ملي مهندسي
صنايع، دانشگاه صنعتي شريف، 9-10 خرداد 1380.
57)
احمدرضا علي حسيني،
رضا توكلي مقدم
و مسعود رباني، بكارگيري الگوريتم ژنتيك براي حل مساله پوشش مجموعه، اولين كنفرانس
ملي مهندسي صنايع، دانشگاه صنعتي شريف، 9-10 خرداد 1380.
58)
رضا توكلي مقدم،
حل مدل خاصي از برنامه زمانبندي با استفاده از يك الگوريتم ابتكاري، سومين سمينار
دستاوردهاي پژوهشي و تحقيقات صنعتي، دانشكده فني، دانشگاه تهران، 12-21 آبان 1380.
59)
رضا توكلي مقدم
و كاوه شيباني، حل مسائل زمانبندي درسي يا استفاده از الگوريتم ژنتيك، هشتمين همايش
دانشجويي مهندسي صنايع، دانشگاه الزهرا (س)، 21-23 اسفند 1379.
60)
رضا توكلي مقدم
و رضا سبحاني، تحليل راههاي گوناگون ارزيابي محيطي شركتها از ديدگاه مديريت
استراتژيك، هشتمين همايش دانشجويي مهندسي صنايع، دانشگاه الزهرا (س)، 21-23 اسفند
1379.
61)
رضا توكلي مقدم،
محمد علي آزاده و صفر شريفي، تدوين برنامه ريزي استراتژيك با استفاده از سيستم
خبره، هشتمين همايش دانشجويي مهندسي صنايع، دانشگاه الزهرا (س)، 21-23 اسفند 1379.
62)
رضا توكلي مقدم
و محمد تقي پرتوي، طراحي سيستم ارزيابي عملكرد و اندازهگيري بهرهوري در مراكز
تحقيقاتي، هشتمين همايش دانشجويي مهندسي صنايع، دانشگاه الزهرا (س)، 21-23 اسفند
1379.
63)
رضا توكلي مقدم،
LADEGA:
مقدمهاي بر الگوريتم ژنتيك در استقرار تسهيلات توليدي، دومين سمينار دستاوردهاي
پژوهشي و تحقيقات صنعتي، دانشكده فني، دانشگاه تهران، 1-5 آذر 1379.
64)
رضا توكلي مقدم،
استفاده از الگوريتم ژنتيك براي حل مسائل استقرار ماشينها، اولين سمينار
دستاوردهاي پژوهشي و تحقيقات صنعتي، دانشكده فني، دانشگاه تهران، 15-19 آذر 1378.
65)
رضا توكلي مقدم
و كاوه شيباني، روش تئوري گراف براي حل مسائل زمانبندي درسي، ششمين همايش دانشجويي
مهندسي صنايع، دانشگاه صنعتي شريف، 22-24 اسفند 1377.
|
مقالات
و
کتب منتخب : |